Showing posts with label E 10. Show all posts
Showing posts with label E 10. Show all posts

Monday, 2 March 2026

Baguley Frame Details Fitted

Having removed the unwanted parts on both frame ends on the Baguley-Drewry loco, it was time to add the first new parts on the loco. As planned I added new couplings/buffers and as an 'extra thing' I also decided to add sanding gear on the centre axle wheels despite it being very hard to see from normal viewing angles.

New buffers are now fitted to Nystrup Gravel's Baguley-Drewry. The buffers were probably made in Nystrup Gravel's own workshop after images of the type usually being fitted to Nagbøl locomotives.

To make a coupling that is fastened well in the frame ends I decided to use the bolts that held the original coupling pockets on the Accucraft model. As usual I cut a cardboard piece to test size and aid in design. I made the real plasticard version a little deeper and added the 'ribs' that enable the coupling chain to be fitted at alternating heights fitting wagons with different frame/coupling heights.

As usual I test design and size with a piece of cardboard before I begin the real work on new parts. 

Finished slightly deeper than the cardboard version, the front buffer is beginning to materialize. I use the bolts from the original coupling to fasten the new buffer.

Once the main construction of the buffers was finished I sanded the corners round and added boltheads in the lower corners from hexagonal plastic strip. Then I drilled a central hole through the buffer to enable a rod to fasten the coupling chain in the coupling/buffer.

The 'ribs' that enables coupling to wagons for varying height are being added. The plasticard jig giving equal distance between the 'ribs' are seen in the foreground.


Steel skips coupled to the Baguley-Drewry's new buffer. 

The pipes for sanding the centre pair of driving wheels (in both directions) were made from simple lengths of metal wire soldered to a bracket cut from scrap etched metal. Each bracket screws into the loco frame underside with two of the screws that held the now removed power pick-ups. 

Sanding pipes fitted to the centre wheel set. In the image they still need to be finely adjusted to a close fit but still allowing the wheel to rotate freely.

A viewer will have to look carefully for the sanding pipes to discover them. They may show more clearly after painting, but even in 1/1 scale sanding pipes aren't the most noticable feature on locomotives.

I'm also exploring how to fit an on/off switch next to the battery and a cardboard test bracket has been mounted on the underside of the frame. If I decide to use this solution I will probably have to adjust the height of the slide switch to avoid it snagging on track parts and vegetation. I still haven't made up my mind completely.

Testing shape and placement of a bracket for an on/off switch. As usual with a cheap prototype test part made from cardboard.

The work on the Baguley-Drewry loco will continue and there is a long list of tasks awaiting me. I will probably be focusing on installing the Loco Remote unit as one of the first tasks, as that will give me a good base to work on: underframe detailed and a running locomotive with 'only' work on the upper body remaining.

Thursday, 5 February 2026

Baguley-Drewry Progress

The 1/19 scale Baguley-Drewry loco is having a rough time. Some rather serious changes have been inflicted with tools I'm not usually using for building models. The frames have been stripped of the original couplings and moulded-on details on the frame ends. New scratchbuilt buffers/coupling are being designed and I'm exploring how best to position battery and Loco Remote equipment. All part of the first stage in the loco's transformation.

A snapshot of the sawed-off Baguley-Drewry on the layout. The developments on the large diesel loco has attracted the attention of a railway enthusiast using his simple box camera to snap a photo of the locomotive.

As the loco was used primarily with standard steel skips at Nystrup Gravel the buffers installed at the sugar beet railways were exchanged with something resembling a standard buffer/coupling from Danish loco producer Nagbøl Machineworks. Probably items that the workshop at Nystrup made themselves. In model I will be making the buffers from plasticard that will be bolted/glued to the frame. To ease painting and handling during use of the saw I removed the sidesteps. Easily done as they were simply bolted in place.  

I used a fine toothed metal saw to cut of the lifting brackets and the rectangular protrusions on the frame ends. To enable a trouble free use of the saw and to minimise risk of damage to the model, it was solidly clamped to the worktable before the saw was used. I mounted the loco on two scraps of surplus board to take the pressure from the clamps and avoiding damage to the loco's wheels and bearings. The loco's motor was wrapped in masking tape to keep metal debris out of it. After sawing I cleaned up the resulting minor unevenness and flash with a file.

All 4 steps were removed. That will ease painting of the steps as well as frame details. I used a new set of tools that will make much of my assembly work on 1/19 models easier and safer.


With a fine toothed metal saw I cut of the lifting brackets and the rectangular protrusions with a, too me at least, unknown function. The centre coupling had been unbolted and removed before the saw was applied.

Apart from cleaning the loco from unwanted parts I have been giving some thoughts to where battery, wiring and Loco Remote unit could best be placed and how lamps and warning lights will be installed. The grand plan isn't there yet, but the basics have been decided. A 9 V battery fits between the frames in the forward part of the loco. From there wires will lead to the Loco Remote placed under the bonnet and from there to the motor.

The Baguley-Drewry seen from below with the rechargable battery in the front end of the frames. I will need to find room for an on/off switch somewhere close by. That shouldn't be impossible.

Side view of the loco with the Loco Remote unit placed in its future location. There seems to resonable room for wires and perhaps even for an extra feature with added lights.

With the first task completed on the rebuilding of the Baguley-Drewry I consider me off with a rather decent start on the project. Particularly removing the cast on parts on the frame ends had worried me a good deal, but with a good plan and careful use of the saw the result didn't turn out bad. Next project is making the buffers and adding a few details to the frames before installing battery and Loco Remote.

Wednesday, 21 January 2026

Baguley-Drewry E 10

Back during the Covid 19 period in 2021 I bought an Accucraft Baguley-Drewry 6 wheel loco in 32 mm gauge in a relatively good bargain on eBay. I wanted a Baguley-Drewry because a loco of that type worked in Denmark and ended its career at Nystrup Gravel. Now the model is on the worktable for conversion into the Nystrup Gravel version from the early 1950's.

The recently finished TU4 is ready to go on a shelf while the Baguley-Drewry will be 'living' on the workbench for some time.

The 150 hp Baguley-Drewry locos were built and marketed for e.g. sugar cane lines Africa, Australia and the Pacific area from 1948-1949. The locos did good service until they became too small for the longer and longer cane trains, some surviving a little longer in use as shunters at the mills. A single 150 hp Baguley-Drewry loco came to Denmark in 1949 working as E 10 at the sugar factory in Saxkøbing for a few years before being regauged and doing limited service on the Nystrup Gravel line.

Not the E 10, but one of Saxkøbing Sugar Factory's 16 ton 8-couplers from Frichs, Denmark. The Baguley-Drewry E 10 was painted in the same characteristic livery of light blue and ivory.

I began work on the model back in november 2021 with removing current collecting gear and test running the loco on battery power with an interim battery installation. Since then the loco has been standing in a cupboard. Now it's been taken out to be my current major project, and the list of planned modifications is quite substantial:

  • removal of the original coupling gear and adding new scratchbuilt ones
  • working headlight front and rear
  • 3 red warning lights arranged in a triangle on each cab side
  • new warning horn 
  • new radiator cover
  • hinges and handles on bonnet doors
  • adding manufacturer's sign on bonnet front
  • lid for sand box on bonnet top
  • jack and brackets for mounting
  • battery installation
  • fitting Loco Remote Maxi control unit
  • adding rudimentary cab interior and floor
  • driver figure
  • total repaint and custom designed decals

While the list is overwhelmingly long, only the installation of the 3 warning lights on each side of the loco will be a new challenge. I'm sure the wiring job will see me sweat, though! 

The old radiator cover has been cut out with the Proxxon's cutting disc. The remaining pieces will be removed with knife and sanding stick. On the top of the bonnet I have cut away the old handrails and horn. Sanding is in progress.

I have removed the old horn and handrails on the bonnet and cut away the old radiator cover, and I will be working my way slowly through designing and adding parts in the coming months. It's unthinkable that I shouldn't fall for the temptation to add in between-projects, and the Baguley-Drewry is probably destined to become a long drawn out project. I hope you will have the patience to follow the proces!