Among lines of standard gauge locos and wagons a light green three car train was placed on transport bogies. It was the world’s first hydrogen-powered train developed specifically for narrow-gauge operations. A total of 21 trains are being built for three Italian regional operators in Sardinia, Calabria and Sicily. Each car is equipped with a powered and an unpowered bogie, while the 'Power Pack Car' rests on two unpowered bogies. A 3-car train has room for 89 seated passengers and a top speed of 100 km/h. You can check out Stadler's press release here.
![]() |
| The three-car train shown in Berlin was loaded on transport bogies in matching colour. |
The first completed train, presented at InnoTrans 2026 in Berlin, was built for the narrow gauge network in Sardinia. Ten vehicles will go to the Sardinia network, 2 for the Sicily line near Etna and the remaining 9 for the network in Calabria.
![]() |
| A Stadler-illustration of the Sicily version of the hydrogen train with Etna in the background. |



No comments:
Post a Comment