Sunday, 10 April 2016

Draining of the Factory Yard (1/35)

In smaller scales it is usually only very few modellers who take the trouble of fitting gully grates in streets and yards. In 1:35 it is a thing I think is important to remember. As model railways are still seen mostly from above, details on the ground are easily seen - or missed. Particularly in a large scale as 1:35.

In the factory yard of Banke's Bakelite I have fitted a single gully grate to help drain the area.. The grate is from a set in etched metal produced by Epokemodeller in 1:32 scale. I raised the ground around the grate slightly to achieve a little depth under the grate and a slight gradient of the yard towards the grate. Few will ever notice the space under the grate but I like to have the three dimensional effect. The hole under the grate was painted black and the grate itself dark grey after it had been blackened.
The Epokemodeller etch. The supply will probably be more than adequate for even the most unlikely expansion of my 1:35 model of Nystrup Gravel.

Ground being built up from scraps of plastic card and plaster. 
Most of the yard itself is covered with a layer of fine, dark grey sand picked up from a sandy trail near my in-laws' cottage.

The factory yard covered with gravel. Soon the brick wall can be glued in place.
I still have to add a little gravel around the grate and weather the grate itself. 
The yard of the bakelite factory. The wall is fitted and I have placed the power pole to test its position. 

No comments:

Post a Comment