Showing posts with label then and now. Show all posts
Showing posts with label then and now. Show all posts

Tuesday, 28 October 2025

Then and Now 2

As my 1/19 scale layout has gradually developed to a semi-finished state I've looked back on a few old images on the blog. I have enjoyed seeing the difference three to four years of hobby work has made. The first 'Then and now' post can be found here.

I have tried to set up almost identical situations on same location to create a 'now and then' comparison. 

In April 2021 track works were making shunting difficult. A lot of planning was needed to keep the supply of gravel running. Still no landscaping, ballast and even the rails are still in shiny nickle silver.

Image from October 2025 showing that a range of improvements have taken place and the photo shows an almost entirely landscaped layout - still with lots of tasks remaining, though.

The Baguley-Drewry locomotive has only reached first stage of rebuilding. In 2021 I removed current collecting gear and taken out the glazing in the cab windows. Hand rails on the top of the bonnet have been removed too. The Baguley will probably become my next loco project once the Fowler is finished.

Friday, 10 January 2025

Then And Now

As my little 1/19 scale layout develops towards a semi-finished state I've been looking back on a few old images on the blog. I have enjoyed seeing the difference three to four years of hobby work has made.

While not from the exact same angle the two images below show the same location on my Nystrup Gravel layout. 

February 2021. Track building just started. The Lister is posing with two skips. The track still lacks fishplates, but provided me the joy of running trains on track I made myself.


January 2025. Track has been finished for years but ballasting and ground cover only recently added.  Some change from the white foam surfaces and cork track bed.


The photo from February 2021 was taken to celebrate the gift of an old Danish State Railways sign telling that the 'Electric train service is erratic'. Something that was also quite true for Nystrup Gravel at the time. Now traffic is more regular and with two locos in service. A third locomotive should enter limited service in 2025.