Nystrup Gravel

A Small Danish Industrial Railway in 1:19 Scale

Monday, 31 October 2016

Bus ready for departure (1/35)

›
My 1:35 scale version of the Opel bus from the Nystrup-Ubehage-Dimholt-Skovby route is now ready for departure. The route connected the town...
1 comment:
Tuesday, 11 October 2016

Fowler Driver Finished (1/35)

›
Last blog post left the Fowler driver ready for primer and paint . In this post the driver will be painted, weathered (yes, I apply weatheri...
Sunday, 2 October 2016

Fowler Driver (1/35)

›
As I was in the proces of constructing three figures for my Opel bus, I took the opportunity to build a driver figure for my Fowler diesel. ...
3 comments:
Sunday, 25 September 2016

The Bright City Lights (1/35)

›
Well, some may argue that I'm taking this post's head line a bit to far! Nystrup isn't a city and the lights are merely some dim...
Wednesday, 14 September 2016

Back to the Work Bench (1/35)

›
After a week long break I'm now going back to modelling. I have been quite busy with paper work for the heritage railway you probably kn...
Thursday, 1 September 2016

Optimizing Loco Running (1/35)

›
As I have my modules set up for operation it is only natural to work on some of my locos' running qualities. While my two Billards with ...
Sunday, 28 August 2016

Main Building at Banke's Bakelite Finished (1/35)

›
After a long construction period the contractor (me) has finally finished work on the main building at the 1:35 scale bakelite factory in Ny...
‹
›
Home
View web version
Powered by Blogger.